Screw down roof LPR1000
Effective and economical solution
Long span ribbed panel: coverage width 1000mm; 0.50mm core thickness, high tensile strength steel (S550); fixed to the structure with self-drilling stainless steel screws.
Advantages of screw down roof LPR1000
- An economical and practical solution
- An increase of safety and watertightness thanks to the strength of its fixation
- Attractive and economical
- Easy to install
- Cost-effective energy efficiency
- Long-term performance
Technical Specifications
- Long span ribbed panel: coverage width 1000 mm
- 0.5 0mm core thickness, high tensile strength steel – S550
- Fixed to the structure with self-drilling stainless steel screws
Accessories
- Skylights
- Sky domes
- Smoke vents
- Roof jack
- Roof curbs
- Ventilators
Three effective systems of screw down roof LPR1000
All RAL colours can be delivered. For short delivery times, we provide some stock colours, which you can see on the right:
- This system is the most economical
- The insulation is made of soft faced glass fiber providing a good acoustical comfort
- It is available with Isobloc and increased insulation thickness to improve overall thermal performance and reduction of thermal bridges
Insulation (mm) | 40 | 60 | 80+ | 100+ | 120+ |
---|---|---|---|---|---|
U-value W/(m²∙K)* | 1.26 | 0.94 | 0.60 | 0.49 | 0.42 |
Standard colour
-
#AZA
-
#01 / ~ RAL: 7044
- It offers the best possible insulation up to 260 mm
- It includes all the advantages of the bridge solution
- It has a solid and aesthetic appearance thanks to the internal panel that acts as vapour barrier, best fire rating
- Optional acoustic panel for increased noise absorption
- Excellent solution for buildings with a high relative humidity inside
Insulation (mm) | 120 | 140 | 160 | 200 | 260 |
---|---|---|---|---|---|
U-value W/(m²∙K) | 0.33 | 0.29 | 0.25 | 0.21 | 0.17 |
Standard colour
-
#AZA
-
#01 / ~ RAL: 7044
Product usage
-
Brewery
When it comes to buildings and production facilities, the German brewery Oettinger has relied on Astron for many years. Astron has already completed…
Learn more -
Machine Production Hall
A very large project with a tight construction timeline is an especially welcome challenge for Astron and our Builder Partners. Building a machine…
Learn more -
Freight-Forwarding Hall
The success story of our customer for the forwarding hall is amazing. Franz Rüdinger invested in his first truck in 1930 and from that day on, never…
Learn more -
Crane Building
This project was commissioned by the Russian company Stadler Plant, located near Minsk. The huge steel hall serves as a production facility for a…
Learn more