Buildings – Other Types – Data Centre

Steel Frame Buildings

Data Centre Construction

Data Centre Construction

Secure and sustainable

This data centre construction is one of the most extraordinary projects that Astron has implemented in its history so far. The owner of the data centre is Quickline Business AG, one of the leading ISP companies in Switzerland. With the new Datacube, currently the most modern data centre in Switzerland, the company can fulfill its customers’ requirements for top telecommunication solutions.

Great importance was particularly placed on the safety, sustainability and low energy consumption of the steel-concrete data centre construction. In addition to physical safety, the building is also equipped with ultra-modern security technology for monitoring. The data centre has a 55 metre high water tank and a private fibre-optic network. But even from the outside, the Datacube is ultra modern. Silver outer panels give the compact architecture a convincing final finish.

Builder
Direct sales - Suisse
Building Usage
Datacenter
Surface
5 500 m²
Span
30 m
Frame Type
Individual
Wall System
Individual
Roof System
Individual

Gallery

  • Buildings – Other Types – Data Centre
  • Buildings – Other Types – Data Centre
  • Buildings – Other Types – Data Centre

Product details

Accessories

Accessories

Many accessories are available for Astron buildings like smoke vents, translucent panels, roof jacks or doors. We offer you a wide range of high-quality products.

Learn more
Wall System: Individual

Wall System: Individual

Astron buildings' walls are economical, functional and durable solution of wall construction. The walls can be simply and quickly erected and are easy to maintain.

Learn more
Roof System: Individual

Roof System: Individual

Astron roofs provide long-term performance and ensures ultimate water tightness. The roofs ares easy to install and offer attractive and economical solutions.

Learn more

The client reports

  • Mark Thommen, CEO of Quickline Business AG

    With the Datacube we are proud to be able to offer our clients the most modern infrastructure available in Switzerland.

    Mark Thommen, CEO of Quickline Business AG

Builders

Find builders near you

More reference projects for other types of Astron buildings