

Metal Structures
Lavorazione dei metalli
Building details
Hall for the metal industry - strong and sturdy for heavy loads
This production hall in central Poland was erected with the help of our Builder Partner PW M. Pasek Sp. J. for Arcelor Construction Poland, the world leader in steel. A hall project in Bytom was completed for this giant in the field of metal structures already back in 2004. Further joint projects are planned.
The challenge in the construction of the building was the enormous weight burden that has to be borne for the production of sandwich panels with metal content. For this reason, the steel hall is equipped with three crane beams and six cranes that can carry a total of up to 80 tons of load. The entire building has the incredible size of 139 metres length and 22 metres width.
- Costruttore
- PW M. Pasek Sp. J. - Poland
- Utilizzo edificio
- Industry
- Superficie
- 5800 m²
- Luce
- 22 m
- Tipologia di struttura
- Individual
- Sistema di parete
- Individual
- Sistema di tetto
- Individual