Inside the Diekirch factory
Erwin Windhausen is a mechanic working at Astron in our Diekirch factory since 1989. As the pilot of new overbending press, he stated: “I am producing beams for the CFL 5-storey car park, these beams are IPE500 in S460 with an overbending value of up to 300 mm. When overbended, we weld wings and studs for concrete on it. The new cambering machine is really fast and powerful to curve profiles till 600 mm height!"
Back