Building System – Main Structure – Primary

Main structure

Primary

Steel frame construction - Primary framing

Primary framing consists of all the structural elements which transfer loads to the foundations. Main frames consist of built-up welded primary framing members, including flange bracings, connection bolts and anchor bolts. The bases of the intermediate frames are generally pinned; however, certain circumstances may dictate the use of fixed constructions.

Astron buildings are optimised to meet the specific requirements of each client. Below you can find the type of frames most commonly used. We can also produce frames outside this range on special studies.

Advantages

  • Aesthetic profile
  • Optimum clear space
  • Easy adaptation of the building in case of modification or change of building use
  • Short construction period
  • Easy integration of all traditional construction materials such as brickwork, glazing, timber, etc.

Technical Specifications

  • AZM1: Clear span building with tapered columns. The rafters are either completely or partially tapered.
  • AZM2,3,4: Modular building with 2, 3 and 4 modules respectively. The exterior columns are tapered, the interior columns may be pipes or welded beams (H profile). The rafters are usually tapered.
  • AS: Buildings with a large clear span, a slope of 20 % and tapered columns.
  • AE: Clear span buildings with parallel flange columns. The rafters are usually tapered.
  • AL: Clear span single slope buildings with parallel flange columns.
  • AP: Wing units which can, in principle, be attached to all other types of buildings. The columns are generally parallel flanged.
  • AT: Tennis buildings: the columns are parallel flanged with a single or double pitched roof.
    Building System – Main Structure – Primary Building System – Main Structure – Primary Building System – Main Structure – Primary Building System – Main Structure – Primary Building System – Main Structure – Primary Building System – Main Structure – Primary Building System – Main Structure – Primary Building System – Main Structure – Primary Building System – Main Structure – Primary Building System – Main Structure – Primary Building System – Main Structure – Primary

Protection

  • All profiles are shot blasted to SA 2.5
  • To provide protection during transportation and erection, all profiles receive a primer coat of 80 microns thickness, in either blue or grey.
  • Optionally, corrosion protection paint can be provided, with a thickness of 100 microns.
Building System – Main Structure – Primary

Gallery

  • Building System – Main Structure – Primary
  • Building System – Main Structure – Primary
  • Building System – Main Structure – Primary

Assembling instruction

#01 Anchor bolts

This video presents following procedures of anchor bolts assembling: • Geodetic survey • Pre-assembling set of anchor bolts • Placing and fixing anchor bolts • Checking correct position

Video: Anchor bolts
12345678910Tragkonstruktion
  • These are explanation videos about the Astron building system.
  • They teach you how to correctly install the different elements of the system.
  • These videos will never replace a personal training.
  • Only certified erectors are allowed to install this product.
  • The videos focus primarily on the erection sequence of our products and do not instruct how to ensure the safety regulation on the site.