

Production halls
Prefabricated Halls for Timber Production
Prefabricated Hall Complex
98,000 m² area built in 10 weeks
This prefabricated hall complex was built for the timber giant Kronostar in Russia. The complex has the incredible total area of 98,000 m² and it is used for timber production for European customers. Kronostar is the market leader in the manufacture and distribution of medium density fibreboard.
Using the prefabricated halls from Astron, the huge indoor complex was built in just 10 weeks. All previous experience was incorporated in the design for this latest timber production plant. Thanks to the efficient hall concept, 60 million m² of laminate can be produced here annually. The focus of the construction was not only the timber production, a responsible approach to the environment and to natural resources was also given particular attention.
- Builder
- Kronostar - Russia
- Building Usage
- Industry
- Surface
- 98,000 m²
- Span
- 72 m
- Frame Type
- AZM1
- Wall System
- LPA900
- Roof System
- Polar roof