REQUIREMENT
Football hall for year-round training
An indoor training hall was to be built for a football club that would allow training to take place all year round, regardless of the weather. The key requirements were a large, column-free playing surface, high ceiling height and a structure that would remain stable even under intensive use. At the same time, a very short construction time was required in order to be able to start training operations quickly.
The hall had to offer protection from the weather, ensure even lighting conditions and be economical to operate. A robust building envelope and a low-maintenance roof system were crucial to ensure long-term reliability of use.
RESULT
Column-free football hall for efficient training operations
Astron realised a covered football training hall with a free span of 72 m, a length of 100 m and a height of 18.5 m. The column-free construction enables unrestricted playing surfaces and flexible training scenarios for team and technical training.
The polygonal roof system with LPR surface layer reliably protects the pitch from wind and weather. Thanks to the precise system construction method, the project was realised in just three months. The result is a robust, durable football hall that offers the club comfortable training conditions all year round while remaining economical to operate.
BUILDING A FOOTBALL HALL WITH A LARGE SPAN
If you want to build an indoor football pitch, you need large, column-free playing areas and a structure that can withstand intensive use. Astron uses system construction to develop football halls that combine short construction times, high stability and economical operation.
Large spans without intermediate supports enable continuous training areas for football, futsal or youth training. Robust roof and wall systems provide reliable protection against the elements and ensure year-round use. At the same time, durable materials and precise prefabrication reduce maintenance costs.
Astron realises football halls for clubs and operators who want to train all year round and rely on planning security, rapid implementation and long-term cost-effectiveness.

YOU MAY ALSO BE INTERESTED IN THESE PROJECTS
Ice rink construction
Utilisation: Sports hall
Location: Zamberk/Czech Republic
Area: 3,000 m²
Indoor swimming pool construction
Use: Sports hall
Location: Cologno al Serio/Italy
Area: 3,000 m²
Riding hall construction
Utilisation: Sports hall
Location: Litovel/Czech Republic
Area: 3,600 m²



