Intumescent Paints Applied in Factory
The intumescent coating used to be applied on the job site, but it can now be done in the factory. For example, for the VIP Lounge Project (photo above) by Swiss Builder BMH Ausführungen, a 30-minute coating was applied in the factory on the primary structure.
This solution offers a number of distinct advantages: the application is independent from the weather conditions (temperature and humidity level), improved quality control, quicker erection, reduction of on-site tasks and the option of getting a certificate of conformity. The subcontractor ensures that the finishes as well as the connection parts on site have a high-quality result.
Do not hesitate to contact Astron for more information.
Back